Remove screws and carrier top to expose the meter. Remove, then disconnect connector from meter.
Disconnect wires from connector to allow wires to pull through handle.
Loosen 2 screws holding tip in the end of the lance. Pull tip out, including wire.
Insert wire of new tip into the end of the handle and push through to carrier. Lock in tip with 2 screws.
Cut wires to expose 1 to 1.25 inches in the carrier.
Attach Chromel lead (with yellow jacket) to the + (positive) terminal of the connector
Attach Alumel lead (with red jacket) to the - (negative) terminal of the connector. Hint: If colored sleeving is absent, Chromel is magnetic and can be identified with a magnet.
Plug the connector into the meter, install in carrier, and replace carrier top.